Aluminum square pipe in the installation of the need to pay attention to the details
1. To choose suitable for their own specifications of aluminum square tube material, you should know that it is different specifications, such as thickness, bottom width and so on are different, so you must choose their own specifications according to their own decoration scheme.
2. The second thing to pay attention to is not to follow their own line of sight installation, if from the point of view of mechanics, when the installation of the ceiling in the line of sight, the effect is the best.
3. If the distance between the material and the wall is too far away, it is easy to lead to all kinds of wires and aluminum square tube hiding is not good, thus affecting the appearance, then the purpose of the ceiling can not be achieved. Therefore, the recommended distance is about half a meter.
4. Data errors that may exist when using tape measure to realize manual measurement. Therefore, some measuring equipment is needed. Measurements can be made using infrared light so that the dimensional data is error-free.
5. In addition, pay attention to the material on the construction site when installing the aluminum square pipe. Because the aluminum square pipe building material is a metal material, in order to avoid the corrosion phenomenon in the future, the external metal needs to do some anti-rust paint surface, which can prevent rust corrosion after soaking in the rain.
6. Aluminum square pipe in the factory have a surface protective film packaging in the installation process need to pay attention to not touch some sharp tools to break the protective film, in the process of transportation also has a layer of protective film outside.
7. When preparing to enter the construction site of the aluminum square pipe ceiling, be sure to wear the safety helmet in advance.
8, all aluminum square pipe construction staff at the site to prohibit smoking, in the warehouse and construction of the place, there should be enough fire equipment in the channel.
9. If there are small electric machinery, it is necessary to maintain leakage equipment. Electrical equipment should be grounded and zero maintenance.
10. All inflammable adhesive, solvent, paint should be stored in a cool place, and need to be far away from the source of fire storage.